4 homes new construction in a neighborhood being built that are still on pre dry wall stag

New Construction Stages 

Why inspect a brand-new home
A new home should be inspected in phases, and the pre-drywall inspection is an important one because
it is the last chance to see the framing, wiring, plumbing and ductwork before they are sealed behind
walls for good.


Municipal code inspections are not the same thing. The county or town inspector checks that work
meets minimum code, often on a tight schedule with many homes per day. An independent inspector
works for you, takes more time, and looks at workmanship and installation quality, not only code
minimums.


Builders are busy, and mistakes are normal. Dozens of subcontractors work on one house, often in a
hurry. Missed straps, kinked ducts and nicked wires are common, and most are cheap to fix before
drywall and expensive (or impossible) to fix after.


Your builder warranty has limits. Defects found after closing often turn into disputes over whether the
item is covered. Defects documented during construction are much easier to get corrected.


The inspection phases at a glance
Plan for three core inspections (pre-drywall, final, 11-month warranty), plus a radon test once the house
is closed in.

​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
​
 
Timing tip: Ask your builder or site supervisor to call you when the municipal framing (rough-in)
inspection is scheduled. The pre-drywall window is often only a few days before the insulation crew
arrives.


The pre-drywall inspection
Schedule it for the short window after all rough-ins are done and the municipal framing inspection has
passed, but before insulation goes in. Too early and systems are missing; too late and the walls are
closed.


What should be complete before the inspection
 

• Framing finished, including interior walls, stairs and roof trusses
•  Roof sheathing and roofing (or at least underlayment) installed
•  Windows and exterior doors installed
•  Exterior sheathing and house wrap installed
•  Rough plumbing, electrical and HVAC ductwork installed
•  Municipal framing / rough-in inspection passed (ask for a copy)
•  No insulation in the walls yet
If the house is not ready, reschedule. A partial inspection leaves gaps you cannot go back and check.

Timing tip: Ask your builder or site supervisor to call you when the municipal framing (rough-in)
inspection is scheduled. The pre-drywall window is often only a few days before the insulation crew
arrives.


The pre-drywall inspection
Schedule it for the short window after all rough-ins are done and the municipal framing inspection has
passed, but before insulation goes in. Too early and systems are missing; too late and the walls are
closed.

What should be complete before the inspection
• Framing finished, including interior walls, stairs and roof trusses
• Roof sheathing and roofing (or at least underlayment) installed
• Windows and exterior doors installed
• Exterior sheathing and house wrap installed
• Rough plumbing, electrical and HVAC ductwork installed
• Municipal framing / rough-in inspection passed (ask for a copy)
• No insulation in the walls yet 
If the house is not ready, reschedule. A partial inspection leaves gaps you cannot go back and check.

What the inspector looks at

Screenshot 2026-11-10 113612.png
Screenshot 2026-11-10 114806.png

Issues commonly uncovered

• Over-cut framing: Plumbers and electricians drilling or notching joists and studs beyond what
   the code or engineered-lumber manufacturer allows.

• Damaged or altered trusses: Cut, cracked or modified trusses, or trusses repaired without an
   engineer's letter.

• Missing hardware: Hurricane ties, joist hangers or hold-downs missing, or installed without all
   the nails.


• Missing nail plates: Pipes and wires within 1¼″ of the stud face without steel plates, so drywall
   screws later puncture them.


• Flashing and wrap defects: Torn house wrap, reverse laps, or windows installed without proper
   flashing, leading to hidden leaks.


• Duct problems: Disconnected, crushed or unsealed ducts; bath fans vented into the attic instead
   of outside.


• Wet or moldy lumber: Framing that got rained on and is being closed in before it dries.

• Fire-blocking gaps: Open chases and penetrations between floors that should be sealed.

• Plumbing support and slope: Drain lines without proper pitch, unsupported pipes, or missing
   protection where pipes pass through framing.


• Debris: Trash, scrap lumber and food waste left in wall cavities, which attracts pests.

The other inspections

Final / pre-closing inspection
Done when the house is complete, utilities are on, and before the builder's walk-through, so you can
bring the report to that meeting. This is a full home inspection of a finished house.


Common findings:

• Negative grading or downspouts draining toward the foundation
• Roof shingle, flashing and gutter defects

• Reversed hot and cold, loose fixtures, slow drains, missing anti-scald settings
• Open grounds, reversed polarity, non-working GFCI or AFCI outlets, missing cover plates
• HVAC: disconnected ducts in the attic
• Missing or compressed attic insulation
• Doors and windows that stick, will not latch, or have broken seals
• Cosmetic damage: drywall cracks and nail pops, scratched floors, chipped counters
• Missing or improperly installed smoke and carbon monoxide alarms

Note: Air conditioning units cannot be tested when the outdoor temperature is too low, because
running them in cold weather can damage the equipment. If the final inspection happens in cold
weather, the A/C will not be tested.


11-month warranty inspection
Most builders give a 1-year workmanship warranty. Schedule this inspection around month 10 or 11 so
you have time to submit a written claim before it expires.

Common findings: settlement cracks in drywall and foundation, truss uplift gaps at ceilings, roof or
window leaks, grading that has settled toward the house, failed caulk and grout, plumbing leaks under
sinks, and HVAC performance problems after a full season.


Radon test
Radon is common in Delaware, Pennsylvania and Maryland, and new construction is not immune. Ask
the builder whether radon-resistant features were installed (gravel layer, sealed sump, vent pipe
stubbed through the roof). Test once the house is closed in and the HVAC is running. If levels are at or
above the EPA action level of 4.0 pCi/L, a roughed-in pipe makes mitigation simpler and cheaper.


Other specialty checks to consider
• Wood-destroying insect inspection: Confirm soil pre-treatment was done and get the certificate.

Working with your builder on findings
Keep it cooperative and in writing. Most builders fix items quickly when they are documented clearly
and raised early.

1. Tell the builder up front that you plan independent inspections, and ask who to contact to
   schedule site access.


2. Send the report promptly to the site supervisor and your sales contact, in writing, with photos.

3.  Ask for a written response for each item: will be corrected, already meets code, or disputed
    (with the reason).


4. Get proof of corrections before the walls close. Ask for dated photos of each repair. Structural
   repairs (such as altered trusses) should come with an engineer's letter. Work that needs a
   permit should be signed off by the municipal inspector. 


5. Do not let drywall start until pre-drywall items are resolved or you have a written agreement on
    how they will be handled.


6. Bring the final inspection report to the walk-through and make sure every open item is on the
    builder's punch list before closing.


7. Keep everything — reports, emails, photos and punch lists — for warranty claims later.



Buyer checklist

• Ask the builder to notify you when the framing inspection is scheduled

• Book the pre-drywall inspection

• Send findings to the builder in writing; get responses and repair photos

• Book the final inspection 1–2 weeks before the walk-through

• Schedule a radon test

• Get the soil termite pre-treatment certificate

• Note your warranty expiration date and book the 11-month inspection

Schedule your inspections
Reliable Home Inspection Service performs new construction phase inspections and radon testing in
Delaware, Pennsylvania and Maryland.